Detailed Endcap Milestones for 1996 - 1997 chambers: 1996 Feb Test stand and DAQ set up at Riverside, P0 runs with cosmic rays. 1996 Apr Two-gap engineering prototype P1a is assembled, start of tests. 1996 May Summary of T1 prototype tests. 1996 May Complete set of drawings for the P1 prototype (3.3x1.2 m2, 6 gaps). 1996 Jun Summary of P0 prototype results (run 1995). 1996 Aug P0 prototype tests (CERN). 1996 Sep P1 prototype is assembled, start of tests. 1996 Oct Results of the first round of aging tests. 1996 Oct Chamber design/cost review. 1996 Dec Report on P1 prototype performance. 1997 Feb Summary of P0 results (run 1996). 1997 May P2 prototype drawings (full scale, suitable for mass production). 1997 Sep P2 prototype is assembled, start of tests. 1997 Oct Chamber design/cost review. 1997 Dec Report on P2 prototype performance. 1997 Dec Muon Technical Design Report 1997 Dec Mass production factory outline and decision on sites. electronics: cathode 1996 Feb Preamp/shaper 4-ch ASIC submission #3 1996 Apr Delivery 3-ch SCA ASIC #2 1996 May Preamp/shaper 16-ch ASIC submission w slow & fast output; prototype 96-ch PCB-1A w/o SCA 1996 Aug Preamp/shaper ASIC submission w/ all design reqs. 1996 Sep Delivery of 1st preamp/shaper ASIC presample; pilot PCB-1A tested. 1996 Nov Delivery of 1st 16-ch SCA ASIC presample; prototype 96-ch PCB-1B w/ full SCA storage and readout. 1996 Dec Delivery of 2nd preamp/shaper ASIC presample. 1997 Apr Delivery of 3rd preamp/shaper ASIC presample; delivery of 2nd 16-ch SCA ASIC presample. 1997 Aug Delivery of preproduction preamp/shaper ASIC sample; pilot PCB-1B tested. 1997 Sep Delivery of 3rd 16-ch SCA ASIC. 1997 Nov Prototype 96-ch PCB-1C (trigger only). anode 1996 Apr 1st submittal of preamp ASIC 1996 May 1st submittal of discriminator ASIC 1996 Aug Construction of PCB-1 1996 Dec 2nd submittal of preamp and disc. ASICs 1997 Jan Begin prototyping of 96-ch PCB2-DAQ. 1997 Apr Delivery of 3rd preamp/shaper ASIC presample. 1997 Jun 96-ch PCB2-DAQ tested. 1997 Jul Begin prototyping of 96-ch PCB2-TRIG. 1997 Aug Delivery of preproduction preamp/shaper ASIC sample. 1997 Dec 96-ch PCB2-TRIG tested. muon trigger: 1996 June Submission #1 of strip comparator tree ASIC. 1996 Aug Production of FPGA chip for strip pattern-finding. 1996 Nov Review of prototype tests of strip comparator tree and pattern-finding chips. 1996 Dec Submission #1 of strip pattern-finding ASIC. 1996 Dec Submission #1 of discriminator/pattern array/bunch ID ASIC for anode wires. 1997 Jan Submission #2 of strip comparator tree chip ASIC. 1997 Jun Review of prototype tests of wire pattern-finding and bunch ID for CSC trigger chips. 1997 Aug Submission #2 of discriminator/pattern array/bunch ID ASIC for anode wires. 1997 Nov Delivery of first prototype CSC trigger motherboard alignment: 1996 Oct Proof of principle for endcap SLMs and secondary sensors. 1996 Oct First design of sensor mounts on P1 CSC chamber. 1996 Dec Mechanical layout of endcap alignment system including endcap SLM and sensor layout, z position transfer fixtures, and connection to Link SLM. 1997 Mar Design of endcap SLM hardware and calibration fixtures. 1997 May Integration of endcap system with Link system. 1997 Oct Test of integrated alignment system. simulation & software: 1996 Mar Implement CMSIM100 for Muon with refined geometry, hit and digitization. 1996 Apr 1st implementation of muon reconstruction package, including the reconstruction bank. 1996 Jun Fast muon track finding and reconstruction. 1996 Sep Simulation of muon LCT (local charged track) and timing for trigger. 1996 Dec Full muon track finding and reconstruction. 1997 Jan Parametrization of neutron background; generate hit banks for charged tracks. 1997 Jun Full matching of muon tracks with corresponding tracks from the Tracker. 1997 Jul Develop a calibration plan and integrate it into the reconstruction package. 1997 Dec Muon trigger strategy (levels 1-3) for the LHC environment.