Endcap Muon Milestones
These milestones have been agreed by CMS and the LHCC referees:
Endcap Iron
- Oct. '96 -- Technical Design Report for coil and yoke
Muon System
- Dec. '97 -- Technical Design Report
(a)Endcap Chambers
MF1/2,MF1/3,MF2,MF3,MF4:
- Dec. '96 -- Full-size large chamber (six layers)
- Dec. '97 -- Final chamber suitable for mass production
Electronics:
- Dec. '97 -- Front-end cards for cathodes and anodes
(b)RPCs
Chambers:
- Dec. '96 -- Definition of final detector parameters
- Dec. '97 -- Final prototype suitable for mass production
Electronics:
- Jun. '97 -- Final front-end chips
(c)Alignment
- Dec. '96 -- Full scale LINK system bench test
- Jun. '97 -- Integrated design for LINK + BARREL + FWD
- Dec. '97 -- Full scale system test